      Rehab Cost Estimate Worksheet        
Property Address:            
               
      ESTIMATED REPAIR COSTS        
ITEM DESCRIPTION NEEDED     UOM QTY ITEM TOT
1 Appraisal       EA    $                      -  
2 Powerwash Outside (Front/Back)       LOT    $                      -  
3 Exterior Paint       LOT    $                      -  
4 Exterior Siding       SQ    $                      -  
5 Roof (3 Ply Flat 10 Year-Shingles)       LOT    $                      -  
6 Roof (Silver Coat)       LOT    $                      -  
7 Gutters (Front/Back)       LOT    $                      -  
8 Security Doors (Installed)       EA    $                      -  
9 Storm Doors (Installed)       EA    $                      -  
10 Interior Doors (Installed)       EA    $                      -  
11 Ceiling Fans       EA    $                      -  
12 Miniblinds (Installed)       EA    $                      -  
13 Windows (Double Hung-Installed)       EA    $                      -  
14 Windows (Glass Block-Installed)       EA    $                      -  
15 Drywall (Installed)       Sheet    $                      -  
16 Interior Paint (2 Coat)       Room    $                      -  
17 Carpet/Flooring)       Yard    $                      -  
18 Ceiling Tiles (Drop Installed)       SQ FT    $                      -  
19 Kitchen (Complete-Rental)       LOT    $                      -  
20 Kitchen (Complete-Rehab)       LOT    $                      -  
21 Bathroom (Tub Coat)       LOT    $                      -  
22 Bathroom (Including Tub Replace)       LOT    $                      -  
23 Bathroom (Rehab)       LOT    $                      -  
24 Electric (Service Line 60-150 AMP)       LOT    $                      -  
25 Electric (New Breaker Box)       LOT    $                      -  
26 Electric (New Funs Per Line)       LOT    $                      -  
27 Light Switches/Outlets (est. 30)       LOT    $                      -  
28 Plumbing 4" Main       LOT    $                      -  
29 Plumbing 1" Feed       LOT    $                      -  
30 PVC Sewer Line 6'       LOT    $                      -  
31 Heater-Gas Forced Air (90% Eff.)       LOT    $                      -  
32 Heater-Boiler (90% Eff.)       LOT    $                      -  
33 Central Air       LOT    $                      -  
34 Hot Water Heater (30 Gallon)       EA    $                      -  
35 Property Cleanout       LOT    $                      -  
36 Demo Work (3 Men)       DAY    $                      -  
37 Removal-40 Yard Dumpster       LOT    $                      -  
38 Post Rehab Cleaning       LOT    $                      -  
39 Parge Basement (Concrete)       LOT    $                      -  
40 Concrete Work (Flooring/Pavement)       SQ FT    $                      -  
41 Termite Treatment (Whole House)       LOT    $                      -  
42 Misc: (Detail Work, Eterminate, Etc.)       LOT    $                      -  
43 Soffit Fascia       FT    $                      -  
44 Landscaping       LOT    $                      -  
45 Interior Trim       L FT    $                      -  
46 Other:            $                      -  
47 Other:            $                      -  
        Total Estamated Repair Costs  $                      -  
               
Notes:              
               
               
               
               
Legend:            
UOM Unit of Measure.  How an item is priced E.G. Windows are priced per EACH Window installed.      
EA Each. Unit of Measure for per itm cost.            
SQ YD Square Yard. Unit of measure used for carpet.  Includes installation.        
SQ FT Square Foot. Unit of measure used in flooring other than dcarpet.  Includes installation.        
SQ Square. Unit of measure used in roofing and siding 10 X 10=100sq ft which equals 1 square.  Includes installation.    
LOT Lump Sum or Flat Price for work performed.  Inculdes installation.